Soak testing is running a system at high levels of load for prolonged periods of time. A soak test would normally execute several times more transactions in an entire day (or night) than would be expected in a busy day, to identify any performance problems that appear after a large number of transactions have been executed.
Also, it is possible that a system may ‘stop’ working after a certain number of transactions have been processed due to memory leaks or other defects. Soak tests provide an opportunity to identify such defects, whereas load tests and stress tests may not find such problems due to their relatively short duration.
The above diagram shows activity for a certain type of site. Each login results in an average session of 12 minutes duration with and average eight business transactions per session.
A soak test would run for as long as possible, given the limitations of the testing situation. For example, weekends are often an opportune time for a soak test. Soak testing for this application would be at a level of 550 logins per hour, using typical activity for each login.
The average number of logins per day in this example is 4,384 per day, but it would only take 8 hours at 550 per hour to run an entire days activity through the system.
By Starting a 60 hour soak test on Friday evening at 6 pm (to finish at 6am Monday morning), 33,000 logins would be put through the system, representing 7½ days of activity. Only with such a test, will it be possible to observe any degradation of performance under controlled conditions.
Some typical problems identified during soak tests are listed below:
bullet
Serious memory leaks that would eventually result in a memory crisis,
bullet
Failure to close connections between tiers of a multi-tiered system under some circumstances which could stall some or all modules of the system.
bullet
Failure to close database cursors under some conditions which would eventually result in the entire system stalling.
bullet
Gradual degradation of response time of some functions as internal data-structures become less efficient during a long test.
Apart from monitoring response time, it is also important to measure CPU usage and available memory. If a server process needs to be available for the application to operate, it is often worthwhile to record it's memory usage at the start and end of a soak test. It is also important to monitor internal memory usages of facilities such as Java Virtual Machines, if applicable.
Long Session Soak Testing
When an application is used for long periods of time each day, the above approach should be modified, because the soak test driver is not Logins and transactions per day, but transactions per active user for each user each day.
This type of situation occurs in internal systems, such as ERP and CRM systems, where users login and stay logged in for many hours, executing a number of business transactions during that time. A soak test for such a system should emulate multiple days of activity in a compacted time-frame rather than just pump multiple days worth of transactions through the system.
Long session soak tests should run with realistic user concurrency, but the focus should be on the number of transactions processed. VUGen scripts used in long session soak testing may need to be more sophisticated than short session scripts, as they must be capable of running a long series of business transactions over a prolonged period of time.
Test Duration
The duration of most soak tests is often determined by the available time in the test lab. There are many applications, however, that require extremely long soak tests. Any application that must run, uninterrupted for extended periods of time, may need a soak test to cover all of the activity for a period of time that is agreed to by the stakeholders, such as a month. Most systems have a regular maintenance window, and the time between such windows is usually a key driver for determining the scope of a soak test.
A classic example of a system that requires extensive soak testing is an air traffic control system. A soak test for such a system may have a multi-week or even multi-month duration.
Tuesday, October 19, 2010
Subscribe to:
Post Comments (Atom)
This is what we are calling as BURN Test; which is used in testing the engine.
ReplyDeleteI adopted this name of BURN test from the hardware manufacturing co. At EIKO, where I used to work in 80s, the hardware QA people used to ON the machines and keep it running for few days and if no issues turn up, the test is passed. This is called BURN test and this we adopted while testing the IX initially.
It may not apply to Maestro much but very applicable to Farm and Lexalytics engine.